Author: Marc Hobbs, Commercial Director, Welwyn Tool Group Ltd – Official Distributor of Leister
Built for Durability
Set in the rolling hills near Darlington, a new holiday lodge development features a custom-designed lake that serves both as a visual centerpiece and a water retention system. To ensure long-term watertight protection, SCLT installed a 1.5 mm HDPE liner over an HPS5 geotextile layer. This combination prevents seepage, accommodates ground movement, and provides environmental protection.
The site’s varied terrain—with changing slopes, narrow trenches, and numerous seams—required welding tools capable of delivering consistent quality under all conditions. SCLT chose the Leister COMET 700 wedge welder and the Leister WELDPLAST 605 GEO extruder, supplied and supported by Welwyn Tool Group, Leister’s UK sales and service center.
Tools That Guarantee Quality
The COMET 700, equipped with a 90 × 50 mm copper wedge and an integrated test channel, ensured uniform, high-strength welds—ideal for long seam runs and trench work. “The COMET 700 is incredibly versatile,” said Wayne, SCLT’s site lead. “It’s perfect for both large and smaller areas and achieves impressive welding speeds.”